You the position in nowadays:Home page > News > The first 18,600dwt Chemical Tanker had the funnel block was lifted and installed> text

The first 18,600dwt Chemical Tanker had the funnel block was lifted and installed

2017-12-20

Warning: getimagesize(../upload_img/20171220151256CR-3I9.JPG) [function.getimagesize]: failed to open stream: Permission denied in /opt/lampp/htdocs/chengxi/cms_chengxi_en/compay_mod_file/news_detail.php on line 43

On the morning of Dec.11, the first 18,600dwt chemical tanker had the funnel block lifted and installed in Chengxi Shipyard.

 
Contact us | Online comments | Information Center
 


维护单位:中国船舶工业集团信息科技中心 地址:北京市西城区月坛北街5号
电话:08610-59518822 传真:+8610-59517959 Email:clients@shipbuilding.com.cn
备案号: 苏ICP备05022505号-1